Jobs underway before Summer 2013 Cruise |
New Solar Panel - June 13 |
Sunset on the Swale - June 2013 |
Chaos - locker contents before lift in May 2013 |
Ditto |
Lift in May 2013 |
Rudder Reinforcement - April 2013 |
New bottom |
New Bottom 2 (Verometal copper) |
Where the engine Water Intake used to be |
Rudder Repairs |
The leading edge of the rudder before filling |
The crack in the rudder's leading edge |
Stripped and rudder leading edge filled |
Old Engine Water intake hole glassed in |
Engine Water intake valve removed |
The old valve |
Failed Heads Outlet Valve |
Where it went |
Anti fouling stripped |
Glass Keel/hull joint filler replaced with flexible filler |
The Fridge compressor (it doesn't work!) |
New Radar Reflector
Old Mast Boot - noe replaced |
Stern and Rudder before repair |
Cockpit through Wheel |
Old Water pump removed (Amsterdam August 2012) |
The old pump |
Before removal |
Thermostat housing (to be removed) |
Preparing to remove flywheel |
AS hiding in Sixhaven Amsterdam |
AS in her Lowestoft berth before purchase (Nov 2011) |
No comments:
Post a Comment
Please feel free to add comments or ask questions